top of page
SUTTER MEDICAL CENTER PARKING STRUCTURE
ROSEVILLE, ca
This project consists of a three-level 193,450 sf, 540-space parking garage with a fourth-floor helipad for air ambulance access. A dedicated elevator provides emergency gurney conveyance to the ground floor.
Design constraints included a sloping site, existing utilities, and required setbacks. Construction was completed within a fully operational hospital campus. This was a design-build project costing $12M.
Richard Harper, Principal-in-Charge, Stantec
![](https://static.wixstatic.com/media/6b9b81_c778d530f07b4d98ac155616c719ba0b~mv2.jpg/v1/fill/w_143,h_67,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/6b9b81_c778d530f07b4d98ac155616c719ba0b~mv2.jpg)
![](https://static.wixstatic.com/media/6b9b81_29831050d1734e2891c50d2ca26b50dc~mv2.jpg/v1/fill/w_143,h_67,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/6b9b81_29831050d1734e2891c50d2ca26b50dc~mv2.jpg)
![](https://static.wixstatic.com/media/6b9b81_e3591d697ccc483f8b70d1c0b092f084~mv2.jpg/v1/fill/w_143,h_67,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/6b9b81_e3591d697ccc483f8b70d1c0b092f084~mv2.jpg)
bottom of page